partial discharge उदाहरण वाक्य
उदाहरण वाक्य
- TEVs are a very convenient phenomenon for measuring and detecting partial discharges as they can be detected without making an electrical connection or removing any panels.
- :: Partial discharges in cables are pretty serious, and after enough of them have happened the cable will fail and have to be replaced.
- Data collected during partial discharge testing is compared to measurement values of the same cable gathered during the acceptance-test or to factory quality control standards.
- With the partial discharge measurement, the dielectric condition of high voltage equipment can be evaluated, and electrical treeing in the insulation can be detected and located.
- Partial discharge measurement is applicable to cables and accessories with various insulation materials, such as polyethylene or paper-insulated lead-covered ( PILC ) cable.
- There is a secondary effect whereby electromagnetic waves generated by the partial discharge also generate TEVs on the surrounding metalwork the surrounding metalwork acting like an antenna.
- Where partial discharge is required to conform to IEC60137, paper and resin insulated conductors are used in conjunction with porcelain, for unheated indoor and outdoor applications.
- In paper-insulated high-voltage cables, partial discharges begin as small pinholes penetrating the paper windings that are adjacent to the electrical conductor or outer sheath.
- To measure the level of partial discharges, 50 60 Hz or sometimes a sinusoidal 0.1 Hz VLF ( very low frequency ) voltage may be used.
- Headquartered in Mississauga, Ontario, Canada, Iris Power is a supplier of on-line partial discharge testing of stator winding insulation in large motors and generators.